SIMULTANEOUS TUBE DRILLING PLANTS > IFST 30-60/3

This plant, designed to be combined with a multiple cutting line, allows partial or passing, simultaneous drilling on each end of tubes produced.
Manual or automatic adjustment of each drilling head allows the plant to be set for specific processes.
The drilling operation is done at the same time as the cut so the product is finished and ready to pack, with no need for any other off line operations.
On line tube drilling increases production process automation allowing just one operator to manage the entire process, increasing productivity.

 icon Scheda IFST 30-60/3

GTC-General Tech Consulting s.r.l. - Via Luigi Longo 25 - 29010 Castelvetro Piacentino, Piacenza
C.F. e P.IVA 01327690192 - R.E.A. 161792